Replacement time of mining drilling rigs

partilhar
Authors Hamodi, Hussan
Lundberg, Jan
Keywords capital equipment, decision support models, life cycle cost, optimal replacement time, optimisation model
Type book chapter
Book
Publisher Imprensa da Universidade de Coimbra
Faculdade de Ciências e Tecnologia da Universidade de Coimbra, Departamento de Engenharia Mecânica
Year of Publ. 2014
ISBN 978-972-8954-42-0 (PDF)
DOI http://dx.doi.org/10.14195/978-972-8954-42-0_17
Language English
Type of Access

Limited

Citation
HAMODI, Hussan; LUNDBERG, Jan. Replacement time of mining drilling rigsReplacement time of mining drilling rigs. presented at the 2014. Coimbra, 2014. Disponível em: <https://digitalis.uc.pt/handle/10316.2/33329>
Nº Leituras:
1430